May 2, 2016

3101 E Broad St. Continued

Work continues on 3101 E Broad St. (See the first post here)

Siding on the West Side of the house has been completed. We're using 1/2" yellow pine.




The next phase of this project is to repair the porch on the East side of the house, which involved some jacking.


 In the process of exploratory demolition, we discovered severe rot and boring holes in the box beam of the porch, so Dr. Chris Koenig and his Assistants Sean and Nick went to work.


We replaced the former box beam with an LVL for a long-term solution.


We replaced several deck boards, including having to mill some tongue-and-groove decking to make it fit in the existing spots.




We got bottom 1x on new beam, got 3 new posts set, removed temporary ledger and shoring jacks. We also replaced all of the posts (4x4).



We are currently repairing these column bases.


And all of the fascia board and other trim elements on the box beam that we replaced are in place.


And the work continues...

Apr 22, 2016

Reclaimed Flooring Installed, and porch deck replacement: Small jobs for valued, long-time clients.

One thing about our work is once you go RBVA, you never go away! Most of our clients are very satisfied withour work and think of us when they need some repairs done to their home. Even if it is a smaller job, we like to help these folks out.

For example, these clients wanted their porch decking replaced (along with some other jobs, such as reclaimed wood floor install, etc.)


Eek! Rotted joist!


Fixed by sistering with new 2x8s.






Apr 20, 2016

Rebuilding Enclosed Back Porch to Appear Like an Open Porch in North Church Hill Part 3

This the next part in our series on the enclosed back porch that will have the facade of an open porch.
See the first part (demo to framing) here ;
and the Second part which takes us from framing to to exterior completion and interior drywall

When we last left off, the exterior which has the facade of a full porch using Boral for simulated column, handrails, and trim, and hardiboard cladding was in the process of being installed... here are the complete photos.




With paint! This is infinitely nicer than the previous wonky porch.



And just for perspective, a before photo:

Now we go to framing the inside. 

There are two parts to this: an upstairs bathroom remodel, adding a downstairs bathroom and laundry room to the enclosed porch, and a master suite closet/nook.

 In the last post, the crew had just begun framing the interior and progress continues. There is Jerrett working on what will the closet in this master suite





Then the electrical rough-in happened


And drywall. We had to cut the drywall around the arched opening. 




Mar 29, 2016

Rebuilding Enclosed Back Porch to Appear Like an Open Porch in North Church Hill Part 2

This the next part in our series on the enclosed back porch that will have the facade of an open porch. See the first part (demo to framing) here

We left off with Chad and Cody installing an LVL on the second floor, and we pick up with second floor framing.

We are also replacing the roof. Here are the 2x8 rafters.


Roof Sheathing, 4x8 plywood panels cut to fit.


All of the sheathing is complete!
 

And wrapped with Tyvek.


Our roofers: Saunders Roofing put the drip edge and TPO roof  down.


Then came the gutters, windows, and a 200 pound door.

Syd, Ryan, and Sean put the hardboard siding on the building that they will then affix the faux columns, railing, and other porch material to.


Speaking of which... these are the Boral column bases that with give the illusion of full columns.



While Syd, Sean, and Ryan worked on the exterior cladding, Cody, Chad, and Jerrett began framing inside.