Work continues on E Grace Street in Church Hill. We have packed and framed the walls, laid down the floor, and are about to begin framing the roof on the back of the house.
Showing posts with label rough carpentry. Show all posts
Showing posts with label rough carpentry. Show all posts
Mar 25, 2015
Framing Our New Shop
With the concrete floor poured, work continues on the new shop as we frame the space from which we will continue to expand RVBA.
We are partitioning part of the shop off into an upper level office.
Subscribe to:
Posts (Atom)








.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)