Work continues on E Grace Street in Church Hill. We have packed and framed the walls, laid down the floor, and are about to begin framing the roof on the back of the house.
Showing posts with label framing. Show all posts
Showing posts with label framing. Show all posts
Apr 13, 2015
Completing Framing of our New Shop
The RBVA Shop project is progressing at break neck pace!
The bathroom by our main plumber, Ronnie Gray.
The office.
Mar 25, 2015
Framing Our New Shop
With the concrete floor poured, work continues on the new shop as we frame the space from which we will continue to expand RVBA.
We are partitioning part of the shop off into an upper level office.
Apr 22, 2014
Master framer stylings
The masterful framing stylings of Chris, Mike and Nick. This is the building of the elevator shaft on Monument Avenue.
Feb 26, 2014
Feb 19, 2014
Kitchen remodel
We removed the floor and a chimney in this home on Monument. The floor will go back in, the chimney will not. All this for a kitchen ceiling that runs continuous, but it will be solid and beautiful. All the old growth heart pine of the floor joists has been saved for future projects.