Mar 7, 2014

Two very different jobsites



On Monument Avenue in the Fan, the Chris-Nick-Mike super crew put the second floor back together again. We used reclaimed tongue and groove flooring from a building demolished on Leigh Street in Carver; we were lucky enough to be on site to salvage before demolition.  We've even got new plumbing run!




Out in Chesterfield, the even more amazing crew of Cody-Ben-Syd has repaired bug damage, worked on siding, and spent a lot of time doing a lot of math to build a cute little shed roof to protect a basement entrance. 


No comments:

Post a Comment