May 30, 2013

Ed Brogan really wanted me to post this. Giant sheets of paint from the rear of 2100 E Broad.

May 29, 2013

Termite damage at 2100 E Broad St


That weird brown discoloration is termite excrement. They've been eating this poor house alive!


 Lots of new salt treated studs and blocking. We'll use these to lift and replace the cottage cheese mudsill underneath.

May 24, 2013

Same room, a few weeks apart. We've come a long way!

Progress at Hilary Baker

The window covered in plywood with its fancy window dressings is rather poignant, don't you think?

Sean Greene

Mo Karn

The access at Hilary Baker and 3 completely restored windows on the third floor. 

The scaffold at the rear is used by the masons to repoint the chimney. The chimneys were relined for wood fire use.


The basement is truly coming together. We hope to pour the concrete slab next week, which will require a pizza party for us.


May 11, 2013

Window repair at Monumental Church

As Thomas says: If Chris built windows in the 19th century this is how they would look.

May 3, 2013

Column rebuild

Nick's very first column rebuild. If you can't tell from the photo, Nick is our resident romantic.

May 1, 2013